Status report on evaluation of works done under Centrally sponsored integrated afforestation and eco-development projects schemes (IAEPS) of yangang-lingmoo-tista watershed project phase I & II: in South district of sikkim (1990-1991 to 1996-1997)
محفوظ في:
المؤلف الرئيسي: | Pramanik, P. |
---|---|
التنسيق: | كتاب |
اللغة: | English |
الموضوعات: | |
الوسوم: |
![]()
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Report of the working group on prioritisation of ongoing and new projects together with phasing.
منشور في: (1999) -
Evaluation report (Final ) on IAEPS project in rang rang -bakcha watershed of north Sikkim district in Sikkim
حسب: Sadhu, M.K -
Identification, design and construction of water storage structures in the Aravallli project
حسب: Mangal, S. L.
منشور في: (1998) -
Project aqua : a source book of inland waters proposed for conservation
منشور في: (1971) -
FAO sponsored project :strengthening monitoring, assessment and reporting on sustainable forest management (MAR - SFM) in India
منشور في: (2009)